Case Summary Structure
A real case page must communicate the buyer problem, equipment delivered, technical scope, quality process, and service result. If customer identity is confidential, the page can be anonymized, but the scope must still be factual.
| Project type | Example field: cementing equipment delivery, fracturing pump package, offshore skid, pump and fluid end supply, or service case. |
|---|---|
| Equipment scope | List verified equipment names and models only. |
| Destination market | Use country or region only when confirmed and approved for publication. |
| Technical requirements | Summarize verified operating, compliance, testing, documentation, or delivery requirements. |
| SJ contribution | Manufacturing, engineering adaptation, testing, documentation, commissioning, parts support, or training. |
| Evidence status | Approved project record, product image, inspection record, shipment record, or customer-approved summary. |
Delivery And Quality Timeline
This timeline must be based on project records. Do not fabricate dates or customer results.
Technical Scope Confirmed
Record equipment scope, operating conditions, standards, documentation needs, and delivery expectation.
Configuration And Review
Confirm product configuration, key components, control requirements, and service package.
Inspection And Testing
Attach real inspection, pressure test, FAT, or quality record before publication.
Delivery And Lifecycle Support
State commissioning, training, spare parts, or after-sales scope only when verified.